Maintenance District 9 Pavement Rehabilitation Project

Print
Press Enter to show all options, press Tab go to next option

Scope of Work

  • Selective removal/reconstruction/surface grinding of deteriorated pavement and placement of asphalt concrete pavement;
  • Application of crack sealing material;
  • Application of emulsion aggregate slurry (Slurry Seal Type II);
  • Placement of asphalt rubber hot mix pavement (ARHM) over asphalt rubber aggregate membrane (ARAM), known as cape seal;
  • Placement of asphalt rubber hot mix pavement (ARHM) over asphalt leveling course;
  • Selective removal and repair of broken and damaged sidewalks, curbs, curbs and gutters, cross gutters, driveway approaches, local depressions, alley aprons and bus pads;
  • Installation of new curb ramps meeting current Federal ADA requirements;
  • Removal and planting of new trees; pruning of tree roots;
  • Adjustment of existing manholes and water meters to finished grade; and
  • Removal and replacement of existing traffic striping and installation of new striping.

Construction Updates

  • This project is currently in design. Construction is anticipated to begin in summer of 2020.

Construction Schedule 

Check back at the start of the project!

Traffic Impacts

Check back at the start of the project!

Project Location

 MD9 Pavement Rehab - Project Location Map

Construction Photos 

Check back at the start of the project!

Community Meetings

Check back at the start of the project!

Contact Information

  • Public Works Engineering: (818) 548-3945
  • Public Works Project Manager: Viktoriya Pakhanyan, Email