Emergency Sewer and Storm Drain Repair Project, Phase II

Print
Press Enter to show all options, press Tab go to next option

Project Description

As a critical part of maintaining the integrity of the City’s Sewer and Storm Drain system which allows the City’s residents to maintain their quality of life in the City of Glendale, Public Works performs critical repairs to the City’s sewer and storm drain infrastructure. Phase 1 of this project consisted of completing a total of 238 linear feet of sewer repairs at 20 locations, installing 3570 linear feet of sewer pipe lining at 15 locations, repairing 21 sewer manholes, and repairing 3 storm drain structures (Click Here to learn more about Phase 1). Phase 2 of this project, currently in design, will build upon Phase 1 and reinforce Glendale's wastewater infrastructure at several more locations citywide.

Construction Schedule

  • Beginning in late 2019, barring any unforeseen circumstances.

Construction Updates

No updates at this time.

Project Locations

Project locations will be uploaded once design is completed.

Construction Photos

Check back once construction begins!

Contact

  • Public Works Engineering Division: (818) 548-3945
  • Public Works Project Manager: Armen Avazian, email