Home MenuWest Glendale ADA Curb Ramp Installation, Sidewalk Repair and Pavement Management Program Phase 3
Project Location:
Scope of Work
This project scope of work consists of the following:
-
Selective removal/reconstruction/surface grinding of deteriorated pavement and placement of asphalt concrete pavement
-
Placement of asphalt rubber hot mix pavement (ARHM) over asphalt leveling course
-
Selective removal and repair of broken and damaged sidewalks, curbs, curbs and gutters, cross gutters, driveway approaches, local depressions, alley aprons and bus pads
-
Installation of new curb ramps meeting current Federal ADA requirements
-
Planting of new trees
-
Adjustment of existing manholes and water meters to finished grade
-
Removal and replacement of existing traffic striping and installation of new striping
Phase
- The project is currently in the design phase.
Construction Schedule
- Construction is tentatively scheduled to start Fall 2026.
Construction Photos
Contact Information
- Public Works Engineering: (818) 548-3945