West Glendale ADA Curb Ramp Installation, Sidewalk Repair and Pavement Management Program Phase 3

Print
Share & Bookmark, Press Enter to show all options, press Tab go to next option

Project Location:   

West Glendale ADA Ph 3 - Aug 2025

 

 Scope of Work

This project scope of work consists of the following:

  • Selective removal/reconstruction/surface grinding of deteriorated pavement and placement of asphalt concrete pavement

  • Placement of asphalt rubber hot mix pavement (ARHM) over asphalt leveling course

  • Selective removal and repair of broken and damaged sidewalks, curbs, curbs and gutters, cross gutters, driveway approaches, local depressions, alley aprons and bus pads

  • Installation of new curb ramps meeting current Federal ADA requirements

  • Planting of new trees

  • Adjustment of existing manholes and water meters to finished grade

  • Removal and replacement of existing traffic striping and installation of new striping

Phase

  • The project is currently in the design phase.

Construction Schedule

  • Construction is tentatively scheduled to start Fall 2026.

Construction Photos

Garden St

Contact Information

  • Public Works Engineering: (818) 548-3945
  • Public Works Project Manager: Huang Zheng, Email