City of Glendale, CA
Home MenuSouth Central Avenue and Los Feliz Road Improvements Project
Project Location
- S. Central Avenue – Colorado Street to San Fernando Road
- Los Feliz Road - San Fernando Road to Glendale Avenue
Funding Sources
The project is funded with Measure R funds.
Scope of Work
- Removal/reconstruction/surface grinding of deteriorated pavement and placement of asphalt concrete pavement
- Placement of asphalt rubber hot mix pavement (ARHM) over asphalt leveling course
- Selective removal and repair of broken and damaged sidewalks, curbs, curbs and gutters, cross gutters, driveway approaches, local depressions, alley aprons and bus pads
- Installation or modification of curb ramps meeting the latest Americans with Disabilities Act (ADA) guidelines
- Planting trees in empty and new tree wells to provide continuous shading
- Adjusting utility frame and covers to finished roadway pavement grade
- Installing new traffic striping, pavement markings and signage including Sharrows and bike lane improvements per City of Glendale Bicycle Master Plan requirements
- Modification of existing traffic signals at the following intersections:
- S. Central Avenue and Colorado Street
- S. Central Avenue and W. Lomita Avenue
- S. Central Avenue and W. Windsor Road
- Conducting storm drain and sanitary sewer infrastructure analysis and design
Phase
The project is in design phase.
Construction Schedule
Construction is tentatively scheduled to start Summer 2028 barring unforeseen circumstances.
Traffic Impacts
Check back at the start of the project.
Construction Photos
Contact Information
- Public Works Engineering: (818) 548-3945
- Public Works Project Manager: Tatevik Barakazyan, Email