San Fernando Road Beautification Project Phase II

Print
Share & Bookmark, Press Enter to show all options, press Tab go to next option

Project Location

The project is located on:

  • San Fernando Road between Alameda Avenue and Grandview Avenue
  • San Fernando Road between Elk Avenue and Los Angeles Street 

For information about improvements to streets adjacent to San Fernando Road, visit

San Fernando ph 2 March 2026-01

 San Fernando ph 2 March 2026-02

Funding Sources
The project is funded with San Fernando Corridor tax share funds. 

Scope of Work

  • Surface grinding and placement of approximately 1.6 centerline miles of asphalt rubber hot mix (ARHM).
  • Selective removal, repair, and reconstruction of damaged curbs and gutters, sidewalks, driveways, cross gutters, alley aprons, and bus pads.
  • Modification and reconstruction of approximately existing curb ramps to meet current ADA standards.
  • Adjustment of existing manholes and water meters to finished grade.
  • Removal and replacement of existing traffic striping and pavement markings.
  • Improve intersections with curb extensions or refuge islands for pedestrian safety.
  • Planting of new street trees.
  • Installation of drywells and bioswales.
  • Bus stop improvements.
  • Traffic signal modifications and upgrades.
  • Installation of landscape parkway

Community Outreach

Transportation and Parking Commission Meeting
When: Monday, April 27, 2026
Time: 6:00pm to 8:00pm
Location: Council Chambers, 613 E. Broadway, 2nd Floor, Glendale, CA 91206

Community Open House
When: Monday, October 20, 2025
Time: 4:00pm to 7:00pm
Location: Griffith Manor Park Community Room, 1551 Flower St., Glendale, CA 91201

Phase

The Project is currently in the design phase.

Construction Schedule

Construction is tentatively scheduled to start Winter 2027 barring any unforeseen circumstances.

Construction Updates

Check back at the start of the project!

Traffic Impacts

Check back at the start of the project!

Construction Photos

San Fernando rd July 1 2025

San Fernando Rd 3

Above photos represent Phase I post-construction for reference.