Project Location
The project is located on:
- San Fernando Road between Alameda Avenue and Grandview Avenue
- San Fernando Road between Elk Avenue and Los Angeles Street
For information about improvements to streets adjacent to San Fernando Road, visit
Funding Sources
The project is funded with San Fernando Corridor tax share funds.
Scope of Work
- Surface grinding and placement of approximately 1.6 centerline miles of asphalt rubber hot mix (ARHM).
- Selective removal, repair, and reconstruction of damaged curbs and gutters, sidewalks, driveways, cross gutters, alley aprons, and bus pads.
- Modification and reconstruction of approximately existing curb ramps to meet current ADA standards.
- Adjustment of existing manholes and water meters to finished grade.
- Removal and replacement of existing traffic striping and pavement markings.
- Improve intersections with curb extensions or refuge islands for pedestrian safety.
- Planting of new street trees.
- Installation of drywells and bioswales.
- Bus stop improvements.
- Traffic signal modifications and upgrades.
- Installation of landscape parkway
Community Outreach
Transportation and Parking Commission Meeting
When: Monday, April 27, 2026
Time: 6:00pm to 8:00pm
Location: Council Chambers, 613 E. Broadway, 2nd Floor, Glendale, CA 91206
Community Open House
When: Monday, October 20, 2025
Time: 4:00pm to 7:00pm
Location: Griffith Manor Park Community Room, 1551 Flower St., Glendale, CA 91201
Phase
The Project is currently in the design phase.
Construction Schedule
Construction is tentatively scheduled to start Winter 2027 barring any unforeseen circumstances.
Construction Updates
Check back at the start of the project!
Traffic Impacts
Check back at the start of the project!
Construction Photos
Above photos represent Phase I post-construction for reference.
Contact Information:
Huang Zheng, P.E., Civil Engineer II
(818) 937-8250
Armen Avazian, P.E., Principal Civil Engineer
(818) 548-3945