Downtown Glendale ADA Curb Ramp Installation and Sidewalk Repair Project Phase I

Print
Share & Bookmark, Press Enter to show all options, press Tab go to next option

Scope of Work

• Selective removal, repair, and reconstruction of damaged curbs, gutters, sidewalks, driveways, cross gutters, and alley aprons.
• Selective removal, repair, and reconstruction of damaged asphalt and Portland cement concrete pavements.
• Installation of new ADA compliant curb ramps where none existed.
• Modification and reconstruction of existing ramps to meet current ADA standards.

Location Map 

Downtown Glendale ADA Curb Ramp 3-2026

Funding Sources
The project is funded with Gas Tax funds.

Phase
The project is currently in the design phase.

Construction Schedule
Construction is tentatively scheduled to start in Summer 2027 barring any unforeseen circumstances. 

Traffic Impacts
Please check back at the start of the project.

Construction Photos
Calif Ave SW 6-25 IMG_3448

Contact Information
• Public Works Engineering: (818) 548-3945
• Public Works Project Manager: Masis Soleymani, Email