California Ave and Adjacent Streets Stormwater Capture Project

Print
Share & Bookmark, Press Enter to show all options, press Tab go to next option

Scope of Work

  • Installation of 24 drywell systems.
  • Installation of 24 bio-retention areas.
  • Reconstruction of existing curb ramps to meet current ADA standards; and
  • Selective removal and reconstruction of damaged curbs and gutters, and sidewalks.

Project Location

 California Ave SW map jpg

 Phase

  • Design

Construction Updates

  • This project is currently in the design phase.

Construction Schedule

  • Check back at the start of construction.

Traffic Impacts

  • Check back at the start of the project.

Construction Photos

  • Check back at the start of the project.

Calif Ave SW 6-25 IMG_3448

Contact Information

  • Public Works Engineering, (818) 548-3945
  • Public Works Project Manager: Marc David, email