Scope of Work
- Installation of 24 drywell systems.
- Installation of 24 bio-retention areas.
- Reconstruction of existing curb ramps to meet current ADA standards; and
- Selective removal and reconstruction of damaged curbs and gutters, and sidewalks.
Project Location
Phase
- Design
Construction Updates
- This project is currently in the design phase.
Construction Schedule
- Check back at the start of construction.
Traffic Impacts
- Check back at the start of the project.
Construction Photos
- Check back at the start of the project.
Contact Information
- Public Works Engineering, (818) 548-3945
- Public Works Project Manager: Marc David, email