Colorado Street and Columbus Avenue Rehabilitation Project

Print
Press Enter to show all options, press Tab go to next option

Scope of Work

  • Selective removal, reconstruction, and surface grinding of deteriorated pavement and placement of asphalt concrete pavement;
  • Overlay of asphalt rubber hot mix pavement (ARHM);
  • Realignment of the sides streets and selective removal and repair of broken and damaged sidewalks; curb and gutters; cross gutters, and alley and driveway aprons;
  • Removal of substandard curb ramps and construction of new curb ramps that are complaint with the Americans with Disabilities Act;
  • Modification of Traffic Signals;
  • Installation of striping and other pavement markings.

Construction Schedule

  •  This project is currently in design. Construction is anticipated to begin in early 2020

Project Location

Colorado-Columbus

Construction Photos

Please check back at the start of the project.

Contact Information

  • Public Works Engineering, (818) 548-3945
  • Public Works Project Manager: Saumil Mody, Email