City of Glendale, CA
Home Sitemap ContactSGCP Draft EIR
South Glendale Community Plan Draft EIR
The 60-day public review period is for the Draft Environmental Impact Report (DEIR) was from January 11, 2018 through March 12, 2018.
DRAFT ENVIRONMENTAL IMPACT REPORT SECTIONS
- TITLE PAGE & TABLE OF CONTENTS
- 1.0 INTRODUCTION
- 2.0 SUMMARY
- 3.0 PROJECT DESCRIPTION
- 4.0 INTRODUCTION TO THE ANALYSIS
- 4.1 AESTHETICS
- 4.2 AIR QUALITY
- 4.3 BIOLOGICAL RESOURCES
- 4.4 CULTURAL RESOURCES
- 4.5 GEOLOGY AND SOILS
- 4.6 GREENHOUSE GAS EMISSIONS
- 4.7 HAZARDS AND HAZARDOUS MATERIALS
- 4.8 HYDROLOGY AND WATER QUALITY
- 4.9 LAND USE AND PLANNING
- 4.10 MINERAL RESOURCES
- 4.11 NOISE
- 4.12 POPULATION AND HOUSING
- 4.13 PUBLIC SERVICES
- 4.14 RECREATION
- 4.15 TRANSPORTATION AND TRAFFIC
- 4.16 UTILITIES AND SERVICE SYSTEMS
- 5.0 OTHER CEQA CONSIDERATIONS
- 6.0 ALTERNATIVES TO THE PROPOSED PROJECT
- 7.0 REPORT PREPARERS
- APPENDIX A NOTICE OF PREPARATION
- APPENDIX B AIR QUALITY ASSESSMENT
- APPENDIX C BIOLOGY TABLES
- APPENDIX D GREENHOUSE GAS REPORT
- APPENDIX E NOISE TECHNICAL REPORT
- APPENDIX F TRAFFIC ANALYSIS REPORT
- APPENDIX G HISTORIC RESOURCE SURVEY
- APPENDIX H WATER SUPPLY ASSESSMENT
- APPENDIX I PLANNING DOCUMENTS
Additional Resources