BEGIN:VCALENDAR
VERSION:2.0
PRODID:City of Glendale, CA Calendar Creator
METHOD:PUBLISH
BEGIN:VEVENT
DTSTAMP:20260116T144918
DTSTART:20260115T180000
DTEND:20260115T200000
SUMMARY:Community Meeting: District 12 Pavement Management Program Implementation Project
DESCRIPTION:<h4>Virtual &amp; In-Person Community Meeting</h4><p><strong>Date: Thursday, January&nbsp;15, 2026<br>Time: 6:00 PM<br>Meeting will be held in person at:&nbsp;<br>Glendale City Hall Council Chambers,<br>613 E. Broadway, Glendale, CA 91206</strong></p><p><span style="font-size: 18.4px;">For public comment during the meeting, call:&nbsp;(818) 937-8100.</span></p><p><span style="font-size: 18.4px;">To watch the meeting live on&nbsp;YouTube, </span><a href="https://www.youtube.com/live/oERz2xTn7YA?si=FrGHQC2gHe9acLIF" target="_blank" rel="noopener" style="font-size: 18.4px;">click here</a>.</p><p>For more information, visit:&nbsp;GlendaleCA.gov/District12PMP</p><p>If you require American Sign Language interpretation,&nbsp;call (818) 548-3945 72 hours prior to the meeting.</p><p><strong>Project Description</strong></p><ul>    <li>Pavement rehabilitation</li>    <li>Applying rubberized asphalt, crack sealing material, and slurry seal</li>    <li>Repairing broken sidewalks, curbs, gutters, and driveway entrances</li>    <li>Installing new ADA-compliant curb ramps</li>    <li>Adjusting utility covers to new street level</li>    <li>Updating street striping and markings</li></ul><p><strong>Project Schedule</strong></p><h3><span style="color: rgb(112, 112, 112); font-family: proxima-nova, sans-serif; font-size: 18.4px;">Construction is tentatively scheduled to start in Fall 2026, barring any&nbsp;</span><span style="color: rgb(112, 112, 112); font-family: proxima-nova, sans-serif; font-size: 18.4px;">unforeseen circumstances.</span></h3><p><strong>Contact Information</strong></p><p>Huang Zheng, Project Manager</p><p>HZheng@GlendaleCA.gov</p><p>(818) 548-3945</p>
X-ALT-DESC;FMTTYPE=text/html:<h4>Virtual &amp; In-Person Community Meeting</h4><p><strong>Date: Thursday, January&nbsp;15, 2026<br>Time: 6:00 PM<br>Meeting will be held in person at:&nbsp;<br>Glendale City Hall Council Chambers,<br>613 E. Broadway, Glendale, CA 91206</strong></p><p><span style="font-size: 18.4px;">For public comment during the meeting, call:&nbsp;(818) 937-8100.</span></p><p><span style="font-size: 18.4px;">To watch the meeting live on&nbsp;YouTube, </span><a href="https://www.youtube.com/live/oERz2xTn7YA?si=FrGHQC2gHe9acLIF" target="_blank" rel="noopener" style="font-size: 18.4px;">click here</a>.</p><p>For more information, visit:&nbsp;GlendaleCA.gov/District12PMP</p><p>If you require American Sign Language interpretation,&nbsp;call (818) 548-3945 72 hours prior to the meeting.</p><p><strong>Project Description</strong></p><ul>    <li>Pavement rehabilitation</li>    <li>Applying rubberized asphalt, crack sealing material, and slurry seal</li>    <li>Repairing broken sidewalks, curbs, gutters, and driveway entrances</li>    <li>Installing new ADA-compliant curb ramps</li>    <li>Adjusting utility covers to new street level</li>    <li>Updating street striping and markings</li></ul><p><strong>Project Schedule</strong></p><h3><span style="color: rgb(112, 112, 112); font-family: proxima-nova, sans-serif; font-size: 18.4px;">Construction is tentatively scheduled to start in Fall 2026, barring any&nbsp;</span><span style="color: rgb(112, 112, 112); font-family: proxima-nova, sans-serif; font-size: 18.4px;">unforeseen circumstances.</span></h3><p><strong>Contact Information</strong></p><p>Huang Zheng, Project Manager</p><p>HZheng@GlendaleCA.gov</p><p>(818) 548-3945</p>
LOCATION:City Hall\, 613 E. Broadway Glendale\, California 91206
CLASS:PUBLIC
END:VEVENT
END:VCALENDAR
