Battery Energy Storage System (ESS)

Print
Press Enter to show all options, press Tab go to next option

Scope of Work

Installation of a 2MW Battery Energy Storage System (ESS), at Grandview Substation. This ESS helps regulate our interconnection to operate within threshold demands. In addition, the system helps mitigate the intermittence of the renewable resources such as solar generation.

This project is scalable so that we can gain experience on how to use the storage technology to determine full scale energy storage projects in the future. The scale projects will increase the redundancy and resiliency of our power system.

Some of the installed equipment and devices are:

  • 52 Ft. Steel H-Frame.
  • 69kV GIS Breaker.
  • 2MVA, 69kV-373V Power Transformer.
  • 2MVA Inverter (PCS.)
  • 2MW Battery Energy Storage System.

Completion Date

April 2017

Project Location

6135 San Fernando Road (Grandview Substation.)

Construction Photos

Battery Energy Storage Pic Battery Energy Storage Pic 2

Contact Information:

GWP Electrical Engineering
(818) 548-3921